Have an assembly or production package?
Upload CAD, drawings, BOMs, weld requirements, finishes, and inspection needs for an immediate preliminary estimate and fabricator review.

Two-tier commitment
Complex builds get an honest two-stage timeline instead of one number pulled out of the air.
Issued at quotation, alongside your preliminary estimate — a real range based on your build package as submitted.
Issued once requirements are complete and the design is frozen — the date you can plan production and receiving around.
Typical build-to-print lead time runs 4–8 weeks; your quote confirms the range for your specific build.
What to include
CAD, drawings, and BOMs for every part and assembly, plus weld requirements, finish call-outs, and inspection needs. A fabricator reviews the full package — not just the parts list — before your estimate becomes a firm, orderable quote.